  "$schema": "https://verbaipsa.org/api/v1/schema/stelle.schema.json",
  "amtlich": false,
  "api_json": "/api/v1/ch/vpea/art-11.fr.json",
  "api_md": "/api/v1/ch/vpea/art-11.fr.md",
  "edition": "Fedlex, Systematische Rechtssammlung des Bundes",
  "edition_id": "fedlex-sr",
  "eid": "art_11",
  "extraktionsregel": "akn-kanon-v1",
  "fassung_kennung": "ch/vpea/2026-07-09/art-11",
  "fundstelle": "https://www.fedlex.admin.ch/eli/cc/2000/123/fr#art_11",
  "fussnoten": [],
  "gliederung": [
    {
      "ebene": "section",
      "eid": "sec_3",
      "num": "3. Abschnitt:",
      "titel": "Bau und Inbetriebnahme"
    }
  ],
  "id": "ch/vpea/art-11",
  "ist_geltend": true,
  "kanonische_url": "https://verbaipsa.org/ch/vpea/art-11/fr/",
  "kennung": "ch/vpea/art-11",
  "lizenz": "gemeinfrei, Art. 5 URG",
  "num": "Art. 11",
  "quelle_sha": "d2c592f6546fcc63336b3cd1168a6fbec6dc5380396c2760c48382645b2686e9",
  "schema": 1,
  "sha256": "e699f5c567bc15a1c21888273a4fd8eaf5eb83fbdba92b9842c4c39a890002a9",
  "sprache": "fr",
  "sr": "734.25",
  "stand": "2026-07-09",
  "stelle": "art-11",
  "titel": "Prorogation de la validité de l’approbation des plans",
  "typ": "stelle",
  "url": "/ch/vpea/art-11/fr/",
  "werk_id": "ch/vpea",
  "werk_kennung": "vpea",
  "werk_kurztitel": "OPIE",
  "werk_titel": "Ordonnance sur la procédure d’approbation des plans des installations électriques",
  "wortlaut": "Si l’exécution d’un plan entreprise à temps est interrompue durant plus d’une année et que plus de trois ans se sont écoulés depuis l’entrée en force de la décision, la prorogation de l’approbation des plans doit être demandée à l’inspection."
}